Home/Industry Insights/What are the changes in the 2024 Ontario Building Code? Highlights
Construction

Structural engineering
Overview → Load-bearing wall removal Underpinning & walkouts Shoring & retaining walls Inspection & evaluation Steel, wood & concrete designArchitectural design
Overview → Building permit drawings Custom homes & 3D views Design / build Planning & zoning (COA) Interior & mechanical designHome/Industry Insights/What are the changes in the 2024 Ontario Building Code? Highlights
Construction
Ontario announced a new 2024 Ontario Building Code (OBC). The changes prioritize public safety, housing affordability, sustainability, and climate resilience while streamlining processes for builders and municipalities. The new Building Code aligns with the National Building Code (NBC) while retaining provisions specific to Ontario’s needs, ensuring consistency across the province. The 2024 OBC has been effective since January 1, 2025.
Building Permit applications must be submitted using the 2024 Ontario Building Code.
The list below includes highlights and new requirements that may be applicable to your projects compared to the 2012 OBC version. Please note that this list is not a complete list of code changes. The Province of Ontario’s website provides the latest version of the 2024 Ontario Building Code
Adjustments to nosing size in stairs
New requirements for open stair risers
Increased restrictions on opening sizes for stair guards
Expanded requirements for carbon monoxide alarms
New minimum separation distance requirements for exhaust outlets
Minimum sump pit sizes
General Review by a Professional Engineer required for all underpinning
Smoke-tight barriers replace traditional fire separations
Mandatory installation of interconnected smoke alarms
Increased requirements for carbon monoxide alarms
Lower ceiling heights and shared egress options
Prohibited sharing of return air on purpose-built two-unit buildings
(Conversions of existing buildings can still share a furnace for up to four units under Part 11 of the Building Code)
General Review by a Professional Engineer required for all underpinning
Requirements expanded to more residential occupancies
Added requirements for care occupancies and some commercial establishments
Decibel level of audible signaling device added for smoke alarms
Harmonized with the NBC
Mandatory rough-in for subfloor depressurization in all new homes
SB-9 revised with prescriptive requirements for rough-ins
New connections to preservative-treated wood
Updated fastening and anchorage requirements
Increased seismic and high-wind area considerations
New provisions for:
Rafters
Ceiling joists
Braced wall panels
Updated rafter-to-joist nailing chart with new spacings and increased nailing requirements
Insulated Concrete Form (ICF) foundation walls now permitted for buildings up to:
Two storeys
Maximum floor-to-floor height of 3000 mm (10 ft.)
New requirements for attaching siding to ICF forms and sheathing
Insulated vinyl siding now permitted
Polypropylene siding now permitted
New subsection added for polypropylene siding
Harmonized with the National Building Code in the following areas:
Importance categories — revised descriptions
Solar panels — new provisions to calculate wind and snow loads
Canopies and parapets — new wind load calculations for:
Attached canopies
Roof parapets
Balcony guards at top of buildings
Earthquake design updates
General Review by a Professional Engineer required for all underpinning
Each dwelling unit must have its own thermostat for independent control
Subsection 6.2.4 (Air Ducts for Low Capacity Systems in OBC 2012) moved to Section 9.33 Heating and Air-Conditioning
Section 9.32 Ventilation harmonized with NBC
Removal of ventilation Types I to IV
Ventilation of storage and repair garages harmonized
(except carbon monoxide requirements in repair garages)
Greater flexibility and more material choices
Improved health and safety requirements
Maximum temperature reduced from 49°C to 43°C in healthcare and senior facilities
Clarification of technical requirements for:
Shower heads
Domestic water tanks
Grease interceptors
Standardization of non-potable water systems:
Rainwater harvesting
Greywater reuse
Increased safety requirements for:
Septic tanks
Treatment units
Holding tanks
New standards for prefabricated septic and sewage holding tanks
Includes safety screen below cleanout covers
Revised spacing requirements for pipes and chambers
Ensures even effluent distribution in filter beds
Clarified materials for the Type A Dispersal Bed mantle
Note: Additional articles will be released to provide detailed explanations of major changes and new requirements in the 2024 OBC.
Get started